Hazleton Library Renovation

Overview

The renovation of the Mary M. and Bertil E. Lofstrom Library, scheduled to be completed in March 2020, will create a library that best meets the needs of patrons through state-of-the art spaces, technology, resources, and services. The goal is to provide a place that ensures the research, teaching, and learning needs of students, faculty, and staff through improved and expanded student study spaces, group study rooms, and collaboration areas.

Temporary Library Locations During Construction

Temporary locations have been identified for library business and activities during the construction. They are:

Graham Building

Library Computer Lab (G-109)

  • PCs
  • Macs
  • Printers

Library Programs (G-114)

  • Textbooks
  • Media (DVDs, Virtual Reality, etc.)
  • Anatomical Models
  • Technology (phone chargers, laptops, iPads, calculators, etc.)
  • Maker-Space (3D Printing, Button Maker, Paper Cutter, etc.)
  • Scannx
  • Photocopier (Student and Faculty)
  • Scantron
  • Interlibrary Loan (books and items from other libraries can be sent to this space for pickup)

Butler Building

  • Math Dimension (B-204)

Memorial Building

  • Gina Monks Office (M-201)
  • Nicole Young Office (M-108)

Inaccessible items – Offsite Storage

  • General Collection
  • Archives
  • One Button Studio
  • Maker-Space Laser Cutter/engraver, drill press, dremels, rock tumblers, and small hand tools.  Any questions please email Erik Angel or visit the swing space (G-114).